MAPREDUCE-3325. Improvements to CapacityScheduler doc. (Thomas Graves via mahadev) - Merging r1201925 from trunk
git-svn-id: https://svn.apache.org/repos/asf/hadoop/common/branches/branch-0.23@1201927 13f79535-47bb-0310-9956-ffa450edef68
This commit is contained in:
parent
686975c9fb
commit
526e738813
|
@ -24,6 +24,9 @@ Release 0.23.1 - Unreleased
|
|||
MAPREDUCE-3370. Fixed MiniMRYarnCluster and related tests to not use
|
||||
a hard-coded path for the mr-app jar. (Ahmed Radwan via vinodkv)
|
||||
|
||||
MAPREDUCE-3325. Improvements to CapacityScheduler doc. (Thomas Graves
|
||||
via mahadev)
|
||||
|
||||
OPTIMIZATIONS
|
||||
|
||||
BUG FIXES
|
||||
|
|
|
@ -50,7 +50,7 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
that the available resources in the Hadoop cluster are shared among multiple
|
||||
organizations who collectively fund the cluster based on their computing
|
||||
needs. There is an added benefit that an organization can access
|
||||
any excess capacity no being used by others. This provides elasticity for
|
||||
any excess capacity not being used by others. This provides elasticity for
|
||||
the organizations in a cost-effective manner.
|
||||
|
||||
Sharing clusters across organizations necessitates strong support for
|
||||
|
@ -58,7 +58,7 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
safe-guards to ensure the shared cluster is impervious to single rouge
|
||||
application or user or sets thereof. The <<<CapacityScheduler>>> provides a
|
||||
stringent set of limits to ensure that a single application or user or queue
|
||||
cannot consume dispropotionate amount of resources in the cluster. Also, the
|
||||
cannot consume disproportionate amount of resources in the cluster. Also, the
|
||||
<<<CapacityScheduler>>> provides limits on initialized/pending applications
|
||||
from a single user and queue to ensure fairness and stability of the cluster.
|
||||
|
||||
|
@ -67,7 +67,7 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
economics of the shared cluster.
|
||||
|
||||
To provide further control and predictability on sharing of resources, the
|
||||
<<<CapacityScheduler>>> supports <heirarchical queues> to ensure
|
||||
<<<CapacityScheduler>>> supports <hierarchical queues> to ensure
|
||||
resources are shared among the sub-queues of an organization before other
|
||||
queues are allowed to use free resources, there-by providing <affinity>
|
||||
for sharing free resources among applications of a given organization.
|
||||
|
@ -76,7 +76,7 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
|
||||
The <<<CapacityScheduler>>> supports the following features:
|
||||
|
||||
* Heirarchical Queues - Heirarchy of queues is supported to ensure resources
|
||||
* Hierarchical Queues - Hierarchy of queues is supported to ensure resources
|
||||
are shared among the sub-queues of an organization before other
|
||||
queues are allowed to use free resources, there-by providing more control
|
||||
and predictability.
|
||||
|
@ -96,12 +96,12 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
capacity. When there is demand for these resources from queues running below
|
||||
capacity at a future point in time, as tasks scheduled on these resources
|
||||
complete, they will be assigned to applications on queues running below the
|
||||
capacity. This ensures that resources are available in a predictable and
|
||||
elastic manner to queues, thus preventing artifical silos of resources in
|
||||
the cluster which helps utilization.
|
||||
capacity (pre-emption is not supported). This ensures that resources are available
|
||||
in a predictable and elastic manner to queues, thus preventing artifical silos
|
||||
of resources in the cluster which helps utilization.
|
||||
|
||||
* Multi-tenancy - Comprehensive set of limits are provided to prevent a
|
||||
single application, user and queue from monpolizing resources of the queue
|
||||
single application, user and queue from monopolizing resources of the queue
|
||||
or the cluster as a whole to ensure that the cluster isn't overwhelmed.
|
||||
|
||||
* Operability
|
||||
|
@ -110,8 +110,8 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
capacity, ACLs can be changed, at runtime, by administrators in a secure
|
||||
manner to minimize disruption to users. Also, a console is provided for
|
||||
users and administrators to view current allocation of resources to
|
||||
various queues in the system. Administrators can also
|
||||
<add additional queues> at runtime.
|
||||
various queues in the system. Administrators can <add additional queues>
|
||||
at runtime, but queues cannot be <deleted> at runtime.
|
||||
|
||||
* Drain applications - Administrators can <stop> queues
|
||||
at runtime to ensure that while existing applications run to completion,
|
||||
|
@ -139,7 +139,7 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
|| Property || Value |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.resourcemanager.scheduler.class>>> | |
|
||||
| | <<<org.apache.hadoop.yarn.server.resourcemanager.scheduler.fifo.CapacityScheduler>>> |
|
||||
| | <<<org.apache.hadoop.yarn.server.resourcemanager.scheduler.capacity.CapacityScheduler>>> |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|
||||
* Setting up <queues>
|
||||
|
@ -155,13 +155,14 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
child queues.
|
||||
|
||||
The configuration for <<<CapacityScheduler>>> uses a concept called
|
||||
<queue path> to configure the heirarchy of queues. The <queue path> is the
|
||||
full path of the queue's heirarcy, starting at <root>, with . (dot) as the
|
||||
<queue path> to configure the hierarchy of queues. The <queue path> is the
|
||||
full path of the queue's hierarchy, starting at <root>, with . (dot) as the
|
||||
delimiter.
|
||||
|
||||
A given queue's children can be defined with the configuration knob:
|
||||
<<<yarn.scheduler.capacity.<queue-path>.queues>>>
|
||||
|
||||
<<<yarn.scheduler.capacity.<queue-path>.queues>>>. Children do not
|
||||
inherit properties directly from the parent.
|
||||
|
||||
Here is an example with three top-level child-queues <<<a>>>, <<<b>>> and
|
||||
<<<c>>> and some sub-queues for <<<a>>> and <<<b>>>:
|
||||
|
||||
|
@ -197,52 +198,59 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.capacity>>> | |
|
||||
| | Queue <capacity> in percentage (%). |
|
||||
| | The sum of capacities for all queues, at each level, should be less than |
|
||||
| | or equal to 100. |
|
||||
| | The sum of capacities for all queues, at each level, must be equal |
|
||||
| | to 100. |
|
||||
| | Applications in the queue may consume more resources than the queue's |
|
||||
| | capacity if there are free resources, providing elasticity. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.maximum-capacity>>> | |
|
||||
| | Maximum queue capacity in percentage (%). |
|
||||
| | This limits the <elasticity> for applications in the queue. |
|
||||
| | Defaults to -1 which disables it. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.minimum-user-limit-percent>>> | |
|
||||
| | Each queue enforces a limit on the percentage of resources allocated to a |
|
||||
| | user at any given time, if there is demand for resources. The user limit |
|
||||
| | can vary between a minimum and maximum value. The former depends on the |
|
||||
| | number of users who have submitted applications, and the latter is set to |
|
||||
| | this property value. For e.g., suppose the value of this property is 25. |
|
||||
| | can vary between a minimum and maximum value. The the former |
|
||||
| | (the minimum value) is set to this property value and the latter |
|
||||
| | (the maximum value) depends on the number of users who have submitted |
|
||||
| | applications. For e.g., suppose the value of this property is 25. |
|
||||
| | If two users have submitted applications to a queue, no single user can |
|
||||
| | use more than 50% of the queue resources. If a third user submits an |
|
||||
| | application, no single user can use more than 33% of the queue resources. |
|
||||
| | With 4 or more users, no user can use more than 25% of the queues |
|
||||
| | resources. A value of 100 implies no user limits are imposed. |
|
||||
| | resources. A value of 100 implies no user limits are imposed. The default |
|
||||
| | is 100.|
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.<queue-path>.user-limit-factor>>> | |
|
||||
| | The multiple of the queue capacity which can be configured to allow a |
|
||||
| | single user to acquire more resources. By default this is set to 1 which |
|
||||
| | ensures that a single user can never take more than the queue's configured |
|
||||
| | capacity irrespective of how idle th cluster is. |
|
||||
| | capacity irrespective of how idle th cluster is. Value is specified as |
|
||||
| | a float.|
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|
||||
* Running and Pending Application Limits
|
||||
|
||||
|
||||
The <<<CapacityScheduler>>> supports the following parameters to control
|
||||
the runnign and pending applications:
|
||||
the running and pending applications:
|
||||
|
||||
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|| Property || Description |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| <<<yarn.scheduler.capacity.maximum-applications>>> | |
|
||||
| | Maximum number of jobs in the system which can be concurently active |
|
||||
| | both running and pending. Limits on each queue are directly proportional |
|
||||
| | to their queue capacities. |
|
||||
| | Maximum number of applications in the system which can be concurrently |
|
||||
| | active both running and pending. Limits on each queue are directly |
|
||||
| | proportional to their queue capacities and user limits. This is a
|
||||
| | hard limit and any applications submitted when this limit is reached will |
|
||||
| | be rejected. Default is 10000.|
|
||||
*--------------------------------------+--------------------------------------+
|
||||
| yarn.scheduler.capacity.maximum-am-resource-percent | |
|
||||
| | Maximum percent of resources in the cluster which can be used to run |
|
||||
| | application masters - controls number of concurrent running applications. |
|
||||
| | Specified as a float - ie 0.5 = 50%. Default is 10%. |
|
||||
*--------------------------------------+--------------------------------------+
|
||||
|
||||
* Queue Administration & Permissions
|
||||
|
@ -257,7 +265,7 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
| <<<yarn.scheduler.capacity.<queue-path>.state>>> | |
|
||||
| | The <state> of the queue. Can be one of <<<RUNNING>>> or <<<STOPPED>>>. |
|
||||
| | If a queue is in <<<STOPPED>>> state, new applications cannot be |
|
||||
| | submitted to <itself> or <any of its child queueus>. |
|
||||
| | submitted to <itself> or <any of its child queues>. |
|
||||
| | Thus, if the <root> queue is <<<STOPPED>>> no applications can be |
|
||||
| | submitted to the entire cluster. |
|
||||
| | Existing applications continue to completion, thus the queue can be
|
||||
|
@ -276,7 +284,7 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
|
||||
<Note:> An <ACL> is of the form <user1>, <user2><space><group1>, <group2>.
|
||||
The special value of <<*>> implies <anyone>. The special value of <space>
|
||||
implies <no one>.
|
||||
implies <no one>. The default is <<*>> if not specified.
|
||||
|
||||
* Reviewing the configuration of the CapacityScheduler
|
||||
|
||||
|
@ -295,14 +303,14 @@ Hadoop MapReduce Next Generation - Capacity Scheduler
|
|||
* {Changing Queue Configuration}
|
||||
|
||||
Changing queue properties and adding new queues is very simple. You need to
|
||||
edit <<conf/capacity-scheduler.xml>> and run <rmadmin -refreshQueues>.
|
||||
edit <<conf/capacity-scheduler.xml>> and run <yarn rmadmin -refreshQueues>.
|
||||
|
||||
----
|
||||
$ vi $HADOOP_CONF_DIR/capacity-scheduler.xml
|
||||
$ $YARN_HOME/bin/rmadmin -refreshQueues
|
||||
$ $YARN_HOME/bin/yarn rmadmin -refreshQueues
|
||||
----
|
||||
|
||||
<Note:> Queues cannot be <deleted>, only addition of new queues is supported -
|
||||
the updated queue configuration should be a valid one i.e. queue-capacity at
|
||||
each <level> should be equal to 100%.
|
||||
|
||||
|
||||
|
|
Loading…
Reference in New Issue