HBASE-27662 Correct the line logged with flag hbase.procedure.upgrade-to-2-2 in docs (#5159)

Signed-off-by: Duo Zhang <zhangduo@apache.org>
This commit is contained in:
Yash Dodeja 2023-04-05 21:00:40 +05:30 committed by GitHub
parent a363b76d81
commit f27823e62d
No known key found for this signature in database
GPG Key ID: 4AEE18F83AFDEB23
1 changed files with 5 additions and 1 deletions

View File

@ -377,11 +377,15 @@ And there is a more safer way if you are running 2.1.1+ or 2.0.3+ cluster. It ne
. Shutdown both active and standby Masters (Your cluster will continue to server reads and writes without interruption).
. Set the property hbase.procedure.upgrade-to-2-2 to true in hbase-site.xml for the Master, and start only one Master, still using the 2.1.1+ (or 2.0.3+) version.
. Wait until the Master quits. Confirm that there is a 'READY TO ROLLING UPGRADE' message in the Master log as the cause of the shutdown. The Procedure Store is now empty.
. Wait until the Master quits. Confirm that there is a 'UPGRADE OK: All existed procedures have been finished, quit...' message in the Master log as the cause of the shutdown. The Procedure Store is now empty.
. Start new Masters with the new 2.2+ version.
Then you can rolling upgrade RegionServers one by one. See link:https://issues.apache.org/jira/browse/HBASE-21075[HBASE-21075] for more details.
In case these steps are not done, on starting 2.2+ master, you would see the following exception in the master logs:
`org.apache.hadoop.hbase.HBaseIOException: Unsupported procedure type class org.apache.hadoop.hbase.master.assignment.UnassignProcedure found`
[[upgrade2.0]]
=== Upgrading from 1.x to 2.x