Commit Graph

11 Commits

Author SHA1 Message Date
Ali Beyad 22e6bc8359 Disables unit tests for rolling upgrades, as there are only
rest integration tests.
2016-09-16 11:32:28 -04:00
Ali Beyad 56f97500c6 In the rolling upgrades tests, we do not want to stop nodes
automatically between tasks, as we want some of the nodes from
the previous task to continue running in the next task. This
commit enables a cluster configuration setting to not stop
nodes automatically after a task runs, but instead the creator
of the test task must stop the running nodes explicitly in a
cleanup phase.
2016-09-16 10:36:55 -04:00
Ali Beyad ba072ec18e When Elasticsearch nodes are started in gradle to form a
cluster, we wait for the cluster health to indicate the
necessary nodes have formed a cluster.  This check was an
exact value (equality) check.  However, if we are trying to
connect the nodes in the cluster to nodes from a previously
formed cluster (of the same name), then we will have more
nodes returned by the cluster health check than the current
task's configured number of nodes.  Hence, this check needs
to be a >= check.  This commit fixes it.
2016-09-16 09:41:26 -04:00
Ali Beyad 3f79874042 Prevent the rolling upgrades rest tests from cleaning up indices
after finishing if a the tests.rest.preserve_indices system property
is set
2016-09-14 23:34:19 -04:00
Ali Beyad 513ed58d17 Added a indices flush to the rolling upgrades rest tests to ensure
they are on disk for the upgraded nodes to pick up.
2016-09-13 12:36:20 -04:00
Ali Beyad 0c7dd1865c Reworking yaml tests for rolling upgrades 2016-09-12 18:46:06 -04:00
Ali Beyad 0b3eb11712 Changed rest-api-spec tests folder structure 2016-09-12 16:05:36 -04:00
Ryan Ernst bd2de367cc Use 5.0 alpha5 for bwc version, so we have transport.ports
Also fixed bug to ensure unicast host is writtent in yaml quotes
2016-09-06 16:08:27 -07:00
Ryan Ernst a844b085f1 Made node config always have a unicast transport uri closure 2016-09-06 15:51:14 -07:00
Ali Beyad 5d8aa6b4fe Adds tests for rolling upgrades to execute 2016-09-03 01:34:39 -04:00
Ryan Ernst ecaf6ef001 Add rolling upgrade test project 2016-08-31 16:45:03 -07:00