Gradle's finalizedBy on tasks only ensures one task runs after another,
but not immediately after. This is problematic for our integration tests
since it allows multiple project's integ test clusters to be
simultaneously. While this has not been a problem thus far (gradle 2.13
happened to keep the finalizedBy tasks close enough that no clusters
were running in parallel), with gradle 3.3 the task graph generation has
changed, and numerous clusters may be running simultaneously, causing
memory pressure, and thus generally slower tests, or even failure if the
system has a limited amount of memory (eg in a vagrant host).
This commit reworks how integ tests are configured. It adds an
`integTestCluster` extension to gradle which is equivalent to the current
`integTest.cluster` and moves the rest test runner task to
`integTestRunner`. The `integTest` task is then just a dummy task,
which depends on the cluster runner task, as well as the cluster stop
task. This means running `integTest` in one project will both run the
rest tests, and shut down the cluster, before running `integTest` in
another project.
This change adds a Fixture class for use by gradle. A Fixture is an
external process that integration tests will use. It can be added as a
dependsOn for integTest, and will automatically be shutdown upon success
or failure, as well as relevant information dumped on failure. There is
also an example fixture in this change.