Generalizing BWC building so that there is less code to modify for a release. This ensures we do not
need to think about what major or minor version is in the gradle code. It follows the general rules of the
elastic release structure. For more information on the rules, see the VersionCollection's javadoc.
This also removes the additional bwc snapshots that will never be released, such as 6.0.2, which were
being built and tested against every time we ran bwc tests.
Additionally, it creates 4 new projects that correspond to the different types of snapshots that may exist
for a given version. Its possible to now run those individual tasks to work out bwc logic whereas
previously it was impossible and the entire suite of bwc tests had to be run to work out any logic
changes in the build tools' bwc project. Please note that if the project does not make sense for the
version that is current, that an error will be thrown from that individual project if an attempt is made to
run it.
This should allow for automating the version bumps as well, since it removes all the hardcoded version
logic from the configs.
This commit adds the infrastructure to plugin building and loading to
allow one plugin to extend another. That is, one plugin may extend
another by the "parent" plugin allowing itself to be extended through
java SPI. When all plugins extending a plugin are finished loading, the
"parent" plugin has a callback (through the ExtensiblePlugin interface)
allowing it to reload SPI.
This commit also adds an example plugin which uses as-yet implemented
extensibility (adding to the painless whitelist).
This reverts commit e04e5ab037 as we no longer need the increased
logging for the mixed cluster tests. This will reduce the size of logs for some build failures.
Currently, we are using a plain TransportRequestHandler to post snapshot
status messages to the master. However, it doesn't have a robust retry
mechanism as TransportMasterNodeAction. This change migrates from
TransportRequestHandler to TransportMasterNodeAction for the new
versions and keeps the current implementation for the old versions.
Closes#27151
Prior to this change if the `bwcTest` task is run then it would create
task for each version, but each task in reality would use wireCompatVersions - 1
ES version. So we were not actually testing against 5.6.x versions in the
6.x and 6.0 branches.
This commit adds a gradle project, set inside the root build.gradle,
which controls all our bwc tests. This allows for seamless (ie no errant
CI failures) backporting of behavior.
This commit renames the backwards-5.0 qa test to mixed-cluster and
creates a test within the project per wire compat version. Like with
rolling upgrade tests, the integTest task will run against the most
recent version, while all versions will be tested with the bwcTest task.