Commit Graph

10 Commits

Author SHA1 Message Date
Ryan Ernst 7a2c984bcc Test: Remove multi process support from rest test runner (#21391)
At one point in the past when moving out the rest tests from core to
their own subproject, we had multiple test classes which evenly split up
the tests to run. However, we simplified this and went back to a single
test runner to have better reproduceability in tests. This change
removes the remnants of that multiplexing support.
2016-11-07 15:07:34 -08:00
Ali Beyad 8afc83047f Change the timeout of the rolling upgrades test from 40 mins to 5 mins
to still allow accounting for slow VMs
2016-09-19 15:45:41 -04:00
Ali Beyad 98230d035a Adds a preserveIndicesUponCompletion method to ESRestTestCase
that can be overridden by subclasses if the test must not
delete indices it created after exiting.
2016-09-16 19:21:26 -04:00
Ali Beyad ba072ec18e When Elasticsearch nodes are started in gradle to form a
cluster, we wait for the cluster health to indicate the
necessary nodes have formed a cluster.  This check was an
exact value (equality) check.  However, if we are trying to
connect the nodes in the cluster to nodes from a previously
formed cluster (of the same name), then we will have more
nodes returned by the cluster health check than the current
task's configured number of nodes.  Hence, this check needs
to be a >= check.  This commit fixes it.
2016-09-16 09:41:26 -04:00
Ali Beyad ec7e383783 Better checks for the cluster being up in the rolling upgrades tests. 2016-09-15 15:08:11 -04:00
Ali Beyad 3f79874042 Prevent the rolling upgrades rest tests from cleaning up indices
after finishing if a the tests.rest.preserve_indices system property
is set
2016-09-14 23:34:19 -04:00
Ali Beyad 513ed58d17 Added a indices flush to the rolling upgrades rest tests to ensure
they are on disk for the upgraded nodes to pick up.
2016-09-13 12:36:20 -04:00
Ali Beyad 0c7dd1865c Reworking yaml tests for rolling upgrades 2016-09-12 18:46:06 -04:00
Ali Beyad 0b3eb11712 Changed rest-api-spec tests folder structure 2016-09-12 16:05:36 -04:00
Ali Beyad 5d8aa6b4fe Adds tests for rolling upgrades to execute 2016-09-03 01:34:39 -04:00