This commit adds a gradle project, set inside the root build.gradle,
which controls all our bwc tests. This allows for seamless (ie no errant
CI failures) backporting of behavior.
These tests spin up two nodes of an older version of Elasticsearch,
create some stuff, shut down the nodes, start the current version,
and verify that the created stuff works.
You can run `gradle qa:full-cluster-restart:check` to run these
tests against the head of the previous branch of Elasticsearch
(5.x for master, 5.4 for 5.x, etc) or you can run
`gradle qa:full-cluster-restart:bwcTest` to run this test against
all "index compatible" versions, one after the other. For master
this is every released version in the 5.x.y version *and* the tip
of the 5.x branch.
I'd love to add more to these tests in the future but these
currently just cover the functionality of the `create_bwc_index.py`
script and start to cover the assertions in the
`OldIndexBackwardsCompatibilityIT` test.
This commit changes the rolling upgrade test to create a set of rest
test tasks per wire compat version. The most recent wire compat version
is always tested with the `integTest` task, and all versions can be
tested with `bwcTest`.
This commit expands the logic for version extraction from Version.java
to include a list of all versions for backcompat purposes. The tests
using bwcVersion are converted to use this list, but those tests
(rolling upgrade and backwards-5.0) are still not randomized; that will
happen in another followup.
After splitting integ tests into cluster configuration and the test
runner task, we still have dependencies of the test runner added as deps
of the cluster. This commit adds dependencies directly to the cluster,
so that the runner can have other dependencies independent of what is
needed for the cluster.
We currently have the last minor version of the previous major hardcoded
in tests like rolling upgrade. This change programatically finds this
during gradle initialization by parsing versions from Version.java.
Gradle's finalizedBy on tasks only ensures one task runs after another,
but not immediately after. This is problematic for our integration tests
since it allows multiple project's integ test clusters to be
simultaneously. While this has not been a problem thus far (gradle 2.13
happened to keep the finalizedBy tasks close enough that no clusters
were running in parallel), with gradle 3.3 the task graph generation has
changed, and numerous clusters may be running simultaneously, causing
memory pressure, and thus generally slower tests, or even failure if the
system has a limited amount of memory (eg in a vagrant host).
This commit reworks how integ tests are configured. It adds an
`integTestCluster` extension to gradle which is equivalent to the current
`integTest.cluster` and moves the rest test runner task to
`integTestRunner`. The `integTest` task is then just a dummy task,
which depends on the cluster runner task, as well as the cluster stop
task. This means running `integTest` in one project will both run the
rest tests, and shut down the cluster, before running `integTest` in
another project.
This commit enforces the requirement of Content-Type for the REST layer and removes the deprecated methods in transport
requests and their usages.
While doing this, it turns out that there are many places where *Entity classes are used from the apache http client
libraries and many of these usages did not specify the content type. The methods that do not specify a content type
explicitly have been added to forbidden apis to prevent more of these from entering our code base.
Relates #19388
This is related to #22116. URLRepository requires SocketPermission
connect. This commit introduces a new module called "repository-url"
where URLRepository will reside. With the new module, permissions can
be removed from core.
Sequence BWC logic consists of two elements:
1) Wire level BWC using stream versions.
2) A changed to the global checkpoint maintenance semantics.
For the sequence number infra to work with a mixed version clusters, we have to consider situation where the primary is on an old node and replicas are on new ones (i.e., the replicas will receive operations without seq#) and also the reverse (i.e., the primary sends operations to a replica but the replica can't process the seq# and respond with local checkpoint). An new primary with an old replica is a rare because we do not allow a replica to recover from a new primary. However, it can occur if the old primary failed and a new replica was promoted or during primary relocation where the source primary is treated as a replica until the master starts the target.
1) Old Primary & New Replica - this case is easy as is taken care of by the wire level BWC. All incoming requests will have their seq# set to `UNASSIGNED_SEQ_NO`, which doesn't confuse the local checkpoint logic (keeping it at `NO_OPS_PERFORMED`)
2) New Primary & Old replica - this one is trickier as the global checkpoint service currently takes all in sync replicas into consideration for the global checkpoint calculation. In order to deal with old replicas, we change the semantics to say all *new node* in sync replicas. That means the replicas on old nodes don't count for the global checkpointing. In this state the seq# infra is not fully operational (you can't search on it, because copies may miss it) but it is maintained on shards that can support it. The old replicas will have to go through a file based recovery at some point and will get the seq# information at that point. There is still an edge case where a new primary fails and an old replica takes over. I'lll discuss this one with @ywelsch as I prefer to avoid it completely.
This PR also re-enables the BWC tests which were disabled. As such it had to fix any BWC issue that had crept in. Most notably an issue with the removal of the `timestamp` field in #21670.
The commit also includes a fix for the default value of the seq number field in replicated write requests (it was 0 but should be -2), that surface some other minor bugs which are fixed as well.
Last - I added some debugging tools like more sane node names and forcing replication request to implement a `toString`
There is not yet a BWC layer in sequence numbers. This commit sets the
BWC version to 6.0.0 for the BWC and rolling upgrade tests until this
BWC layer is built.
This commit enables real BWC testing against a 5.1 snapshot. All
REST tests plus rolling upgrade test now run against a mixed version
cross major version cluster.
automatically between tasks, as we want some of the nodes from
the previous task to continue running in the next task. This
commit enables a cluster configuration setting to not stop
nodes automatically after a task runs, but instead the creator
of the test task must stop the running nodes explicitly in a
cleanup phase.
cluster, we wait for the cluster health to indicate the
necessary nodes have formed a cluster. This check was an
exact value (equality) check. However, if we are trying to
connect the nodes in the cluster to nodes from a previously
formed cluster (of the same name), then we will have more
nodes returned by the cluster health check than the current
task's configured number of nodes. Hence, this check needs
to be a >= check. This commit fixes it.