Fixes
```
Could not determine the dependencies of task ':x-pack:qa:full-cluster-restart:with-system-key:v5.6.13#oldClusterTestCluster#node1.copyBwcPlugins'.
```
This reworks how we configure the `shadow` plugin in the build. The major
change is that we no longer bundle dependencies in the `compile` configuration,
instead we bundle dependencies in the new `bundle` configuration. This feels
more right because it is a little more "opt in" rather than "opt out" and the
name of the `bundle` configuration is a little more obvious.
As an neat side effect of this, the `runtimeElements` configuration used when
one project depends on another now contains exactly the dependencies needed
to run the project so you no longer need to reference projects that use the
shadow plugin like this:
```
testCompile project(path: ':client:rest-high-level', configuration: 'shadow')
```
You can instead use the much more normal:
```
testCompile "org.elasticsearch.client:elasticsearch-rest-high-level-client:${version}"
```
This bundles the x-pack:protocol project into the x-pack:plugin:core
project because we'd like folks to consider it an implementation detail
of our build rather than a separate artifact to be managed and depended
on. It is now bundled into both x-pack:plugin:core and
client:rest-high-level. To make this work I had to fix a few things.
Firstly, I had to make PluginBuildPlugin work with the shadow plugin.
In that case we have to bundle only the `shadow` dependencies and the
shadow jar.
Secondly, every reference to x-pack:plugin:core has to use the `shadow`
configuration. Without that the reference is missing all of the
un-shadowed dependencies. I tried to make it so that applying the shadow
plugin automatically redefines the `default` configuration to mirror the
`shadow` configuration which would allow us to use bare project references
to the x-pack:plugin:core project but I couldn't make it work. It'd *look*
like it works but then fail for transitive dependencies anyway. I think
it is still a good thing to do but I don't have the willpower to do it
now.
Finally, I had to fix an issue where Eclipse and IntelliJ didn't properly
reference shadowed transitive dependencies. Neither IDE supports shadowing
natively so they have to reference the shadowed projects. We fix this by
detecting `shadow` dependencies when in "Intellij mode" or "Eclipse mode"
and adding `runtime` dependencies to the same target. This convinces
IntelliJ and Eclipse to play nice.
Use all running nodes as unicast seeds in the rolling restart tests to
avoid a race between pinging and the tests. Without this if the tests
are too fast then when a new node comes up and pings its single
configured seed node that node *might* not have a ping from the other
running node.
This is much more realistic and can find more issues. This causes the
"mixed cluster" tests to be run twice so I had to fix the tests to work
in that case. In most cases I did as little as possible to get them
working but in a few cases I went a little beyond that to make them
easier for me to debug while getting them to work. My test changes:
1. Remove the "basic indexing" tests and replace them with a copy of the
tests used in the OSS. We have no way of sharing code between these two
projects so for now I copy.
2. Skip the a few tests in the "one third" upgraded scenario:
* creating a scroll to be reused when the cluster is fully upgraded
* creating some ml data to be used when the cluster is fully ugpraded
3. Drop many "assert yellow and that the cluster has two nodes"
assertions. These assertions duplicate those made by the wait condition
and they fail now that we have three nodes.
4. Switch many "assert green and that the cluster has two nodes" to 3
nodes. These assertions are unique from the wait condition and, while
I imagine they aren't required in all cases, now is not the time to
find that out. Thus, I made them work.
5. Rework the index audit trail test so it is more obvious that it is
the same test expecting different numbers based on the shape of the
cluster. The conditions for which number are expected are fairly
complex because the index audit trail is shut down until the template
for it is upgraded and the template is upgraded when a master node is
elected that has the new version of the software.
6. Add some more information to debug the index audit trail test because
it helped me figure out what was going on.
I also dropped the `waitCondition` from the `rolling-upgrade-basic`
tests because it wasn't needed.
Closes#25336
This commit adds the ability to specify a plugin from maven for a
test cluster to use. Currently, only local projects may be used as
plugins, except when testing bwc, where the coordinates of the project
are used. However, that assumes all projects always keep the same
coordinates, or are even still plugins, which is no longer the case for
x-pack. The full cluster and rolling restart tests are changed to use
this new method when pulling x-pack versions before 6.3.0.
This commit makes x-pack a module and adds it to the default
distrubtion. It also creates distributions for zip, tar, deb and rpm
which contain only oss code.