OpenSearch/plugins/repository-azure
Ryan Ernst 175bda64a0 Build: Rework integ test setup and shutdown to ensure stop runs when desired (#23304)
Gradle's finalizedBy on tasks only ensures one task runs after another,
but not immediately after. This is problematic for our integration tests
since it allows multiple project's integ test clusters to be
simultaneously. While this has not been a problem thus far (gradle 2.13
happened to keep the finalizedBy tasks close enough that no clusters
were running in parallel), with gradle 3.3 the task graph generation has
changed, and numerous clusters may be running simultaneously, causing
memory pressure, and thus generally slower tests, or even failure if the
system has a limited amount of memory (eg in a vagrant host).

This commit reworks how integ tests are configured. It adds an
`integTestCluster` extension to gradle which is equivalent to the current
`integTest.cluster` and moves the rest test runner task to
`integTestRunner`.  The `integTest` task is then just a dummy task,
which depends on the cluster runner task, as well as the cluster stop
task. This means running `integTest` in one project will both run the
rest tests, and shut down the cluster, before running `integTest` in
another project.
2017-02-22 12:43:15 -08:00
..
licenses Upgrade Azure Storage client to 4.0.0 2016-02-29 15:00:34 +01:00
src Fold InternalSearchHits and friends into their interfaces (#23042) 2017-02-08 14:40:08 +01:00
build.gradle Build: Rework integ test setup and shutdown to ensure stop runs when desired (#23304) 2017-02-22 12:43:15 -08:00