Ensures that the `material-unit-tests` job does not accidentally build
subpackages of the `src/dev-app` in the components repo. This is now
an issue because the components repository updated their dev-app
to use Bazel with more individual subpackages. These subpackages
are not excluded by the `--deleted_packages` flag.
For best practice, we should use the exclusion target pattern
instead of the undocumented `--deleted_packages` flag anyway.
PR Close#32485
This commit changes the Angular compiler (ivy-only) to generate `$localize`
tagged strings for component templates that use `i18n` attributes.
BREAKING CHANGE
Since `$localize` is a global function, it must be included in any applications
that use i18n. This is achieved by importing the `@angular/localize` package
into an appropriate bundle, where it will be executed before the renderer
needs to call `$localize`. For CLI based projects, this is best done in
the `polyfills.ts` file.
```ts
import '@angular/localize';
```
For non-CLI applications this could be added as a script to the index.html
file or another suitable script file.
PR Close#31609
Initially the blocklist has been removed because there were
no remaining disabled tests that failed. Also the blocklist
logic didn't work anymore because the `material-unit-tests` CI
job now runs against `angular/components#master` with Bazel.
388578fec9 tried to revert the removal
of the blocklist in favor of a new upcoming breaking change with
HammerJS, but the revert doesn't help since the blocklist still
doesn't work with Bazel.
In order to make the blocklist work with the unit tests running
with Bazel, a PR has been submitted on the components repository.
See: https://github.com/angular/components/pull/16833.
This commit updates the blocklist logic on the framework side to
work with the new logic on the components repo side.
PR Close#32239
Initially when the `material-unit-tests` job got wired up,
Ivy was not really backwards-compatible and a few bugs caused
test failures when running the Angular Material test suites w/ Ivy.
These bugs got fixed progressively and eventually the test
blocklist became empty. At this point we don't want to regress
in the future and the blocklist should never have new items.
Additionally since we switched the unit-tests job to run against
Angular Material `master` with Bazel, the blocklist is no
longer respected. Therefore we can safely remove the blocklist.
PR Close#32138
Previously, the ivy-2019 branch of the Material (aka components) repo was
used, which contains some changes that were necessary to work with Ivy.
These changes are not longer necessary, as Material's master branch is
fully working with Ivy today. To be up-to-date with recent Material
development and its support for more recent dependencies, e.g. TypeScript,
it is desirable for us to be on a newer version of Material.
This commit moves the Material tests away from the ivy-2019 branch, to a
recent commit on master. We are not targeting the master branch itself,
as that would introduce a moving target into Angular's CI checks, which
is undesirable.
Lastly, the usage of gulp to run Material's tests is changed into using
Bazel, as Material itself is now also built with Bazel.
PR Close#31569
Currently we cache the Material `node_modules` after
the `run_angular_material_unit_tests.sh` completed. This
means that the cache will incorrectly contain the Ivy NPM
package output which might be incompatible with the
other Material dependencies. e.g. the Material postinstall
command now uses a different NGC version that does not
work with the `typescript` version that has been specified in
the Material project.
PR Close#29416