English French Notes Complete/Exclude
|
|
AE $ REQUIRED IN FY:
|
|
CONSTRUCTION $ REQUIRED IN FY:
|
|
PLANNED CONSTRUCTION METHOD:
|
|
TOTAL PROJECT COSTS: $
|
|
PROJECT DESCRIPTION:
|
|
PROJECT JUSTIFICATION:
|
|
WORKLOAD:
|
|
Choose method of project selection
|
|
;2:FROM LIST OF FYFP PROJECTS RETURNED TO SITE
|
|
;3:ALL PROJECTS IN FIVE YEAR FACILITY PLAN
|
|
;2:FROM LIST OF PROJECT APPLICATIONS RETURNED TO SITE
|
|
;3:SELECTED PROJECTS FROM PROGRAM-YEAR LIST
|
|
;2:ALL PROJECTS WITH MONTHLY UPDATES = YES
|
|
Another user is editing this project. Can't select.
|
|
No projects selected!
|
|
RETURNED TO SITE
|
|
No 'Returned' Projects Found!
|
|
RETURNED Five Year Plan Projects
|
|
RETURNED Project Applications
|
|
Project
|
|
is currently being edited!
|
|
SCR)=number of entries in list^screen title
|
|
Enter a list or range to select (1-
|
|
Screen
|
|
ID#
|
|
Enter program that listed projects must match.
|
|
Enter a 4-digit year that listed projects must have as
|
|
the A/E or Construction funding year.
|
|
No Projects matched selection criteria!
|
|
PROGRAM (
|
|
) PROJECTS WITH FUNDING YEAR
|
|
Appl
|
|
5-Yr Plan Project
|
|
Proj. Application
|
|
Regional Construction Database
|
|
G.EN PROJECTS
|
|
To: G.EN PROJECTS
|
|
(s) transmitted from the site
|
|
(s) have been disapproved
|
|
proj. transmitted at
|
|
has been set 'Non-Viable' by
|
|
with the following comments.
|
|
**WARNING: Project with this number not found on your system.**
|
|
) Set Non-Viable Project:
|
|
has been 'Returned to Site' by
|
|
with the following comments. Please make appropriate changes
|
|
and re-transmit the project to the Regional Construction Database.
|
|
) Returned Project to Site:
|
|
///RETURNED TO SITE
|
|
) Disapproved Project:
|
|
not found on your system.**
|
|
Region Summary has Project =
|
|
disapproved so status changed to CANCELED.
|
|
has been 'Authorized' by
|
|
The CONSTRUCTION PROJECT file will automatically be updated
|
|
with the following information.
|
|
STATUS AUTHORIZED
|
|
MONTHLY UPDATES YES
|
|
Approved A/E Funding $
|
|
Approved Construction $
|
|
Design Program Start (Planned)
|
|
Auth Letter Received (Actual)
|
|
Start Schematics (Planned)
|
|
Start DD (Planned)
|
|
Start CD (Planned)
|
|
Issue IFB (Planned)
|
|
Bid Open (Planned)
|
|
Construction Award (Planned)
|
|
) Authorized Project
|
|
ENX)
|
|
ENDIQ(
|
|
Domain not found in PROJECT PLANNING ROLLUP DOMAIN (#100) field
|
|
of the ENG INIT PARAMETERS (#6910) file. Transmission aborted!
|
|
Press RETURN to Continue
|
|
Validating Projects
|
|
No validation problems found
|
|
This project
|
|
the validation checks
|
|
with warnings
|
|
out of
|
|
selected projects failed the validation checks.
|
|
selected projects passed the validation checks with warnings.
|
|
Do you want a detailed report
|
|
Invalid Projects
|
|
Project:
|
|
(passed with warnings)
|
|
Note: E) = Error which prevents transmission W) = Warning
|
|
Five Year Facility Plan
|
|
Project Application
|
|
Progress Report
|
|
Misc.
|
|
Validation Results
|
|
PROJECT NUMBER is required.
|
|
PROJECT TITLE is required.
|
|
MEDICAL CENTER is required.
|
|
STATUS is required.
|
|
PROGRAM is required.
|
|
FACILITY TYPE is required.
|
|
PROJECT CATEGORY is required.
|
|
BUDGET CATEGORY is required.
|
|
MEDICAL CENTER's STATION NUMBER (
|
|
) inconsistent with PROJECT NUMBER (
|
|
) inconsistent with format of PROJECT NUMBER (
|
|
FACILITY TYPE is not NCS but PROJECT NUMBER begins with
|
|
FACILITY TYPE is NCS but PROJECT NUMBER begins with
|
|
) inconsistent with FACILITY TYPE (
|
|
PROJECT CATEGORY (
|
|
BUDGET CATEGORY (
|
|
) inconsistent with PROGRAM (
|
|
STATUS (
|
|
CONSULTANT STUDY
|
|
FUNDING YEAR - CONST required for PROGRAM (
|
|
) and PROJECT CATEGORY (
|
|
BONUS CATEGORY is required for PROGRAM (
|
|
NHCU BEDS (NEW) required for BONUS CATEGORY (
|
|
NHCU BEDS (RENOVATED) required for BONUS CATEGORY (
|
|
NHCU BEDS (CONVERTED) required for BONUS CATEGORY (
|
|
NHCU BEDS (NEW) required for PROJECT CATEGORY (
|
|
NHCU BEDS (RENOVATED) required for PROJECT CATEGORY (
|
|
NHCU BEDS (CONVERTED) required for PROJECT CATEGORY (
|
|
) not supported for the 5-Yr Plan.
|
|
ESTIMATED A/E COST (FYFP) required for FUNDING YEAR - A/E (
|
|
ESTIMATED CONST COST (FYFP) required for FUNDING YEAR - CONST (
|
|
ESTIMATED COST (
|
|
) must be >= (
|
|
) for FACILITY TYPE (
|
|
) and PROGRAM (
|
|
) must be < (
|
|
ESTIMATED A/E COST (
|
|
) does not match APPROVED A/E FUNDING (
|
|
ESTIMATED CONST COST (
|
|
) does not match APPROVED CONSTRUCTION (
|
|
A least one FUNDING YEAR (A/E or CONST) must be the Plan's current year (
|
|
) or later.
|
|
A least one FY (AWARD LEASE or RENT STARTS) must be the Plan's current year (
|
|
) inconsistent for Plan's budget year (
|
|
) inconsistent for Plan's current year (
|
|
) inconsistent for Plan.
|
|
) not supported for Project Applications.
|
|
IMPACT JUSTIFICATION required when IMPACT COST > 0.
|
|
No gross sq ft listed for H089 CHAPTER (
|
|
EPA REPORTABLE (y/n) required for NRM applications.
|
|
EPA REPORTING CATEGORY is required for EPA REPORTABLE (YES).
|
|
EPA REPORTING CATEGORY (
|
|
) inconsistent with PROJECT CATEGORY (
|
|
) inappropriate for project application.
|
|
Project Application must be approved by Chief Engineer.
|
|
Chief Engineer approval date (
|
|
) is over 6 months old.
|
|
Project Application must be approved by VAMC Director.
|
|
VAMC Director approval date (
|
|
PROJECT DESCRIPTION (SHORT) is required.
|
|
JUSTIFICATION (SHORT) is required.
|
|
AMBULATORY CARE
|
|
AMBULATORY CARE PERCENTAGE (
|
|
) inconsistent with BONUS CATEGORY (
|
|
ACTIVATION YEAR (
|
|
) is before FUNDING YEAR - CONST (
|
|
LEASE TYPE is required.
|
|
ESTIMATED ANNUAL RENT COST is required.
|
|
PROPOSED LEASE TERM is required.
|
|
RENTABLE SQ FT is required.
|
|
EXISTING SPACE ANNUAL RENT is required for LEASE TYPE (
|
|
EXISTING SPACE RENTABLE SQ FT is required for LEASE TYPE (
|
|
ENHANCED USE
|
|
LEASE TYPE (
|
|
) inconsistent with BUDGET CATEGORY (
|
|
) is before FY - RENT STARTS (
|
|
) not supported for Progress Reports.
|
|
(PLANNED) is missing the month.
|
|
(REVISED) is missing the month.
|
|
(ACTUAL) is missing the month.
|
|
past due. Enter actual or update revised date.
|
|
(ACTUAL) entered, but percentage not 100
|
|
percentage is blank (expected 0-99 since actual start date exists).
|
|
percentage > 0 but actual start date is blank.
|
|
(PLANNED) before planned start date.
|
|
(REVISED) before start date.
|
|
(ACTUAL) before actual start date.
|
|
(PLANNED) milestone was skipped.
|
|
(ACTUAL) milestone was skipped.
|
|
(PLANNED) before previous milestone
|
|
(REVISED) before previous milestone
|
|
(ACTUAL) before previous milestone
|
|
milestone inappropriate for project.
|
|
Status (
|
|
) appears inappropriate since milestone
|
|
Project appears to be completed, but has Status (
|
|
) inconsistant with FUNDING YEAR - CONST (
|
|
EPA REPORTABLE (y/n) required for NRM projects.
|
|
NHCU AUTHORIZED BEDS required for BONUS CATEGORY (
|
|
NHCU AUTHORIZED BEDS required for PROJECT CATEGORY (
|
|
NHCU BEDS (CONVERTED) (
|
|
) not equal to sum of NHCU CONVERSION numbers (
|
|
This option is now Out of Order. Construction project
|
|
data is now
|
|
entered and reported in a web database at
|
|
Please, contact your Network Capital Assets Coordinator,
|
|
or VSSC
|
|
representative for assistance.
|
|
Your ENG INIT PARAMETERS file (#6910) is not in order.
|
|
EN PROJECTS
|
|
Mail group EN PROJECTS is missing.
|
|
No members found in mail group EN PROJECTS. At least one is required.
|
|
Should you be added as a member of EN PROJECTS
|
|
Members of mail group EN PROJECTS receive messages from
|
|
the VISN concerning projects which have been transmitted
|
|
from their facility to the VISN Construction Database.
|
|
Enter YES to be added to this mail group.
|
|
No valid projects to transmit!
|
|
Since some of the selected projects falied the validated checks,
|
|
none of the selected projects will be transmitted.
|
|
Projects which failed the validation checks will not be transmitted.
|
|
Transmit remaining projects which passed the validation checks
|
|
Answer yes to transmit projects which passed (including those with warnings).
|
|
REPORTING PERIOD
|
|
Enter the reporting period (month and year) for the
|
|
progress reports. Each selected project will be
|
|
updated with this reporting period before transmission.
|
|
Do you want to Queue Transmission
|
|
Enter 'Y' if you want the project data placed in mail
|
|
messages as part of a tasked job.
|
|
TRAMSIT ENG PROJECT DATA (
|
|
ENT(
|
|
Five Year Plan project
|
|
Project Progress Report
|
|
queued for transmission.
|
|
transmitted using
|
|
mail message
|
|
ERROR DURING QUEUED TRANSMISSION
|
|
Engineering Package
|
|
Your queued transmission of
|
|
Five Year Facility Plan Projects
|
|
Project Applications
|
|
Project Progress Reports
|
|
was not performed because the asterisked projects were being edited.
|
|
EN XMIT
|
|
Site transmitted project to Region
|
|
Progress note transmitted
|
|
End of note (
|
|
Now re-building your Work Order File.
|
|
Now re-indexing Work Order File. This could take awhile...
|
|
Now converting LOCATIONS in your Equipment File
|
|
Now converting Work Order LOCATIONS
|
|
Now converting a few data elements in your existing construction projects.
|
|
This shouldn't take very long.
|
|
Now re-indexing
|
|
Finished at
|
|
PRLOCAL]
|
|
Project is locked by another user. Please try later
|
|
Please enter appropriate Project and Budget Categories for the new Program.
|
|
MA,MI,MM,NR,
|
|
The Budget Category has automatically been changed to the default value for the new project category.
|
|
(The previous value was
|
|
Previous Progress Note not found.
|
|
This page is optional since the project category is not NHCU.
|
|
The NHCU data must be entered since the project category is NHCU.
|
|
PRINT WHICH PAGES:
|
|
Print Project Report (10-0051)
|
|
IOINLOW;IOINHI;IOINORM
|
|
Print All Project Reports (10-0051)
|
|
CONSTRUCTION PROJECT PROGRESS REPORT
|
|
SERVICING FACILITY:
|
|
FMS #:
|
|
REPORTING PERIOD:
|
|
BONUS:
|
|
EPA REPORTING CATEGORY:
|
|
NHCU BEDS:
|
|
AUTHORIZED:
|
|
CONVERTED FROM:
|
|
NEW:
|
|
RENOVATED:
|
|
CONVERTED:
|
|
DESIGN:
|
|
CONSTRUCTION:
|
|
CONTRACT DATA
|
|
SUPPLEMENTAL AGREEMENTS
|
|
An asterisk '*' indicates a change since the last transmission.
|
|
REVISED/
|
|
ACTUAL DATE
|
|
Contract:
|
|
Add #:
|
|
Original Award:
|
|
Ded #:
|
|
Net
|
|
Study:
|
|
Schematics:
|
|
Site Survey:
|
|
Design Development:
|
|
Const. Documents:
|
|
Site Visits:
|
|
Const. Period Svcs.:
|
|
Subtotal:
|
|
Add #:
|
|
Original Award:
|
|
Ded #:
|
|
Extension (days):
|
|
Labor (to date):
|
|
Matrls (to date):
|
|
TOTAL P&H:
|
|