A few updates to the schedule and plans.
This commit is contained in:
parent
a0b6a0fe12
commit
d25b519bfb
19
pep-0283.txt
19
pep-0283.txt
|
@ -22,15 +22,17 @@ Abstract
|
|||
release does not count). Release candidates will be spaced at
|
||||
least one week apart (excepting again blunder corrections).
|
||||
|
||||
Here's a tentative release schedule that follows the above
|
||||
guidelines:
|
||||
The schedule so far has had longer gaps than planned:
|
||||
|
||||
alpha 1 -- December 31, 2002
|
||||
alpha 2 -- February 19, 2003
|
||||
beta 1 -- April 25, 2003
|
||||
beta 2 -- late May
|
||||
rc 1 -- late June
|
||||
final -- early July
|
||||
beta 2 -- June 29, 2003
|
||||
|
||||
Here's a tenative schedule for the remaining releases:
|
||||
|
||||
rc 1 -- late July
|
||||
final -- early August
|
||||
|
||||
|
||||
Release Manager
|
||||
|
@ -151,6 +153,10 @@ Completed features for 2.3
|
|||
bits, truncating without range checking. (SF 595026; Thomas
|
||||
Heller did this work.)
|
||||
|
||||
- A new version of IDLE was imported from the IDLEfork project
|
||||
(http://idlefork.sf.net). The code now lives in the idlelib
|
||||
package in the standard library and the idle script is installed
|
||||
by setup.py.
|
||||
|
||||
Planned features for 2.3
|
||||
|
||||
|
@ -163,9 +169,6 @@ Planned features for 2.3
|
|||
feedback to python-dev@python.org; I hope to maintain this for the
|
||||
life of the 2.3 development process.
|
||||
|
||||
- I plan to integrate the new version of IDLE from the IDLEfork
|
||||
project (http://idlefork.sf.net).
|
||||
|
||||
- The import lock could use some redesign. (SF 683658.)
|
||||
|
||||
|
||||
|
|